1330022409_lexingtonhs1_lg_652x437a.jpg1330022437_exterior_1_652x437a.jpg1330022450_interior_2_652x437a.jpg1330022463_interior_1_652x437a.jpg1330022493_lexingtonhs2_lg_652x437a.jpg1330022502_lexingtonhs3_lg_652x437a.jpg

ADDITIONAL VIEWS

1330022409_lexingtonhs1_lg_652x437a.jpg
1330022437_exterior_1_652x437a.jpg
1330022450_interior_2_652x437a.jpg
1330022463_interior_1_652x437a.jpg
1330022493_lexingtonhs2_lg_652x437a.jpg
1330022502_lexingtonhs3_lg_652x437a.jpg

Lexington High School

may 2009 | Pre K-12 | lexington, Ok

In preparation for a 2006 bond issue, Lexington Public Schools selected Architects In Partnership for the planning and design of their new 400 student high school. The first phase of this new facility provided 18 classrooms, 2 science labs, a media center/computer lab, special education, administrative offices and teacher resource areas. A large student commons is the focal point when entering the new building. The second phase of construction includes a new gymnasium with locker rooms, concession facilities, a full kitchen, and cafeteria.

This new high school is part of the master plan for a 32 acre site adjacent to Lexington’s existing campus. Future phases will include a performing arts auditorium, a running track, and a new middle school. Through extensive programming and planning, AIP was able to fully evaluate the schools future needs thereby reducing the schools initial classroom projections which saved square footage and construction costs. Our proven master planning and facility management process allowed Lexington schools to fully utilize their new site while providing for long term future growth.